Australian Technology Park
Current ATP Master Plan to be revised to increase FSR from 1.2:1 to 2:1 with maximum heights increasing from 9 to 12 storeys. RWA estimate final ATP floor space will increase by 20% to 200,000 square metres providing 5,000-8,000 jobs. Approximately four times the 2006 size. Improved connections to Railway Station and North Eveleigh including reinstating a foot and bicycle bridge as well as possible vehicle tunnel. Zoned as Business Park with some Public Recreation along Henderson Road.