<?xml version="1.0" encoding="utf-8" ?>
<rdf:RDF xmlns:rdf="http://www.w3.org/1999/02/22-rdf-syntax-ns#" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:syn="http://purl.org/rss/1.0/modules/syndication/" xmlns="http://purl.org/rss/1.0/">




    



<channel rdf:about="http://www.redwatch.org.au/index_html/RSS">
  <title>The latest news from REDWatch</title>
  <link>http://www.redwatch.org.au</link>

  <description>
    
      REDWatch is a community group which covers the Sydney suburbs of Redfern Eveleigh Darlington and Waterloo. These suburbs make up what the NSW Government generally refers to as Redfern - Waterloo. The area has been subject to various NSW Government interventions since the early 2000's and had its own Government Minister from 2004 to 2011. Interventions have included removing planning responsibilities from City of Sydney Council and having place specific interventions on human services, infrastructure and employment. This history is captured on this website. Currently the focus is on UrbanGrowth's Central to Eveleigh and the proposed redevelopment of the Waterloo Public Housing Estate. Below is the latest news from REDWatch about our area and its issues.
    
  </description>

  

  
            <syn:updatePeriod>hourly</syn:updatePeriod>
            <syn:updateFrequency>1</syn:updateFrequency>
            <syn:updateBase>2006-06-01T20:22:01Z</syn:updateBase>
        

  <image rdf:resource="http://www.redwatch.org.au/logo.png"/>

  <items>
    <rdf:Seq>
      
        <rdf:li rdf:resource="http://www.redwatch.org.au/RWA/Waterloo/stage1/260507wc"/>
      
      
        <rdf:li rdf:resource="http://www.redwatch.org.au/RWA/Waterloo/stage1/260506redw"/>
      
      
        <rdf:li rdf:resource="http://www.redwatch.org.au/RWA/Waterloo/stage1/260507hnsw"/>
      
      
        <rdf:li rdf:resource="http://www.redwatch.org.au/RWA/Waterloo/stage1/260429dphi"/>
      
      
        <rdf:li rdf:resource="http://www.redwatch.org.au/RWA/Waterloo/stage1/260501hnsw"/>
      
      
        <rdf:li rdf:resource="http://www.redwatch.org.au/RWA/Waterloo/stage1/260420cm"/>
      
      
        <rdf:li rdf:resource="http://www.redwatch.org.au/RWA/Waterloo/stage1/260219stk"/>
      
      
        <rdf:li rdf:resource="http://www.redwatch.org.au/RWA/Waterloo/stage1/260313wrgt"/>
      
      
        <rdf:li rdf:resource="http://www.redwatch.org.au/RWA/Waterloo/stage1/260308redw"/>
      
      
        <rdf:li rdf:resource="http://www.redwatch.org.au/RWA/statesignificant/northeveleigh/bridge/260301ebagipa"/>
      
      
        <rdf:li rdf:resource="http://www.redwatch.org.au/RWA/statesignificant/northeveleigh/bridge/260301gipaarup"/>
      
      
        <rdf:li rdf:resource="http://www.redwatch.org.au/RWA/statesignificant/northeveleigh/bridge/260301gipatfnswpref"/>
      
      
        <rdf:li rdf:resource="http://www.redwatch.org.au/RWA/statesignificant/northeveleigh/bridge/260301gipatfnswoptions"/>
      
      
        <rdf:li rdf:resource="http://www.redwatch.org.au/RWA/statesignificant/northeveleigh/bridge/260301gipaheritage"/>
      
      
        <rdf:li rdf:resource="http://www.redwatch.org.au/RWA/statesignificant/northeveleigh/bridge/260301gipacatchment"/>
      
    </rdf:Seq>
  </items>

</channel>


  <item rdf:about="http://www.redwatch.org.au/RWA/Waterloo/stage1/260507wc">
    <title>Stockland / Waterloo Partnership Presentation on Concept PLan May 2026</title>
    <link>http://www.redwatch.org.au/RWA/Waterloo/stage1/260507wc</link>
    <description>This is the presentation made by Stockland / Waterloo Partnership to a REDWatch meeting on 7 May 2026. This presentation explains the the current Concept Plan and Rezoning proposal on exhibition until June 2nd. This presentation was recorded and the video can be found on REDWatch's YouTube at https://youtu.be/LqLmw_IjSWg</description>
    
    <dc:publisher>No publisher</dc:publisher>
    <dc:creator>REDWatch</dc:creator>
    <dc:rights></dc:rights>
    <dc:date>2026-05-11T00:59:10Z</dc:date>
    <dc:type>File</dc:type>
  </item>


  <item rdf:about="http://www.redwatch.org.au/RWA/Waterloo/stage1/260506redw">
    <title>Waterloo South Concept Plan and Rezoning on Exhibition until 2nd June 2026.</title>
    <link>http://www.redwatch.org.au/RWA/Waterloo/stage1/260506redw</link>
    <description>Below are some information from REDWatch about the Exhibition and how to access information and assistance.</description>
    <content:encoded xmlns:content="http://purl.org/rss/1.0/modules/content/"><![CDATA[
<p class="MsoToc1"><span class="MsoHyperlink"><a href="#_Toc228985826">Waterloo
South Concept public exhibition until Tuesday 2<sup>nd</sup> June 2026 &amp;
Documents</a></span></p>
<p class="MsoToc1"><span class="MsoHyperlink"><a href="#_Toc228985827">Social
Impact Assessment and Preliminary Social Impact Management Plan now available</a></span></p>
<p class="MsoToc1"><span class="MsoHyperlink"><a href="#_Toc228985828">REDWatch
Meeting – Hear Stockland talk on Waterloo South Concept Plan - 7 May</a></span></p>
<p class="MsoToc1"><span class="MsoHyperlink"><a href="#_Toc228985829">Information
and Support in understanding the Concept &amp; making submissions</a></span></p>
<p class="MsoToc1"><span class="MsoHyperlink"><a href="#_Toc228985830">What
is the Concept Plan and Rezoning?</a></span></p>
<p class="MsoToc1"><span class="MsoHyperlink"><a href="#_Toc228985831">Scoping
Applications for Development Applications for Stage 1 Waterloo South Lodged</a></span></p>
<p>&nbsp;</p>
<h2><a name="_Toc228985826">Waterloo South Concept public exhibition until Tuesday 2<sup>nd</sup>
June 2026 &amp; Documents</a></h2>
<p>The
Concept State Significant Development and Rezoning Application have been placed
on exhibition for 28 days until 2<sup>nd</sup> June 2026. Tenants were advised
last Friday via this <a href="../../../260501hnsw/view">Homes NSW notification to Waterloo tenants of Concept
Plan Exhibition - 1 May 2026</a> in line with advising tenants first.</p>
<p>This exhibition covers all of Waterloo
South. All official documents are accessible through the planning portal.
Feedback on the proposal must also be made directly through the Planning Portal
to the Department of Planning. It cannot be made via the Consortium or Homes
NSW which cannot submit it on your behalf.</p>
<p>The Exhibition Documents can be found
at <a href="https://www.planningportal.nsw.gov.au/major-projects/projects/waterloo-estate-south-concept">Planning NSW - Waterloo Estate (South) Concept Exhibition</a>.
Printed versions of these reports can also be accessed at Waterloo Connect.</p>
<p>The key document is the <a href="https://majorprojects.planningportal.nsw.gov.au/prweb/PRRestService/mp/01/getContent?AttachRef=SSD-93222706%2120260417T052316.334%20GMT">Waterloo South Concept Environmental Impact Statement</a>
to which almost all the other documents are Appendices supplying additional
information. The last Appendix KK contains the Rezoning Report with the Draft
LEP Maps, Revised Design Guide, Connecting with Country Framework and Retail
Market Demand Assessment.</p>
<p>REDWatch has put together the full
list of the exhibition documents and links to them below:</p>
<ul type="disc">
 <li><a name="_Hlk228955009"></a><a href="https://majorprojects.planningportal.nsw.gov.au/prweb/PRRestService/mp/01/getContent?AttachRef=SSD-93222706%2120260417T052316.334%20GMT">Waterloo South
     Concept Environmental Impact Statement</a></li>
 
 <li><u><a href="https://majorprojects.planningportal.nsw.gov.au/prweb/PRRestService/mp/01/getContent?AttachRef=SSD-93222706%2120260417T051440.039%20GMT">Appendix A - SEARs Compliance Table</a></u></li>
 <li><a href="https://majorprojects.planningportal.nsw.gov.au/prweb/PRRestService/mp/01/getContent?AttachRef=SSD-93222706%2120260417T051440.329%20GMT">Appendix B - Statutory Compliance Table</a></li>
 <li><a href="https://majorprojects.planningportal.nsw.gov.au/prweb/PRRestService/mp/01/getContent?AttachRef=SSD-93222706%2120260417T051440.832%20GMT">Appendix C - Mitigation and Management Measures</a></li>
 <li><a href="https://majorprojects.planningportal.nsw.gov.au/prweb/PRRestService/mp/01/getContent?AttachRef=SSD-93222706%2120260417T051440.618%20GMT">Appendix D - Community Consultation Table</a></li>
 <li><a href="https://majorprojects.planningportal.nsw.gov.au/prweb/PRRestService/mp/01/getContent?AttachRef=SSD-93222706%2120260417T051441.072%20GMT">Appendix E - Assessment against Waterloo South
     Design Guide</a></li>
 <li><a href="https://majorprojects.planningportal.nsw.gov.au/prweb/PRRestService/mp/01/getContent?AttachRef=SSD-93222706%2120260417T051659.925%20GMT">Appendix F - Urban Design Report</a></li>
 <li><a href="https://majorprojects.planningportal.nsw.gov.au/prweb/PRRestService/mp/01/getContent?AttachRef=SSD-93222706%2120260417T051701.650%20GMT">Appendix F - Urban Design Report Appendices</a></li>
 <li><a href="https://majorprojects.planningportal.nsw.gov.au/prweb/PRRestService/mp/01/getContent?AttachRef=SSD-93222706%2120260417T051658.273%20GMT">Appendix G - Survey Plan</a></li>
 <li><a href="https://majorprojects.planningportal.nsw.gov.au/prweb/PRRestService/mp/01/getContent?AttachRef=SSD-93222706%2120260417T051656.736%20GMT">Appendix H - Draft Subdivision Plans</a></li>
 <li><a href="https://majorprojects.planningportal.nsw.gov.au/prweb/PRRestService/mp/01/getContent?AttachRef=SSD-93222706%2120260417T051659.056%20GMT">Appendix I - Designing with Country Report</a></li>
 <li><a href="https://majorprojects.planningportal.nsw.gov.au/prweb/PRRestService/mp/01/getContent?AttachRef=SSD-93222706%2120260417T051703.865%20GMT">Appendix J - Public Domain and Landscape Report</a></li>
 <li><a href="https://majorprojects.planningportal.nsw.gov.au/prweb/PRRestService/mp/01/getContent?AttachRef=SSD-93222706%2120260417T052312.073%20GMT">Appendix K - CPTED Assessment</a></li>
 <li><a href="https://majorprojects.planningportal.nsw.gov.au/prweb/PRRestService/mp/01/getContent?AttachRef=SSD-93222706%2120260417T052313.524%20GMT">Appendix L - Preliminary Public Art Plan</a></li>
 <li><a href="https://majorprojects.planningportal.nsw.gov.au/prweb/PRRestService/mp/01/getContent?AttachRef=SSD-93222706%2120260417T052312.539%20GMT">Appendix M - Engagement Outcomes Report</a></li>
 <li><a href="https://majorprojects.planningportal.nsw.gov.au/prweb/PRRestService/mp/01/getContent?AttachRef=SSD-93222706%2120260417T052310.929%20GMT">Appendix N - Design Excellence Strategy</a></li>
 <li><a href="https://majorprojects.planningportal.nsw.gov.au/prweb/PRRestService/mp/01/getContent?AttachRef=SSD-93222706%2120260417T052312.304%20GMT">Appendix O - Environmental Wind Report</a></li>
 <li><a href="https://majorprojects.planningportal.nsw.gov.au/prweb/PRRestService/mp/01/getContent?AttachRef=SSD-93222706%2120260417T052313.837%20GMT">Appendix P - Visual Impact Assessment</a></li>
 <li><a href="https://majorprojects.planningportal.nsw.gov.au/prweb/PRRestService/mp/01/getContent?AttachRef=SSD-93222706%2120260417T052315.219%20GMT">Appendix Q - Arboricultural Impact Assessment</a></li>
 <li><a href="https://majorprojects.planningportal.nsw.gov.au/prweb/PRRestService/mp/01/getContent?AttachRef=SSD-93222706%2120260417T052314.688%20GMT">Appendix R - BDAR Waiver</a></li>
 <li><a href="https://majorprojects.planningportal.nsw.gov.au/prweb/PRRestService/mp/01/getContent?AttachRef=SSD-93222706%2120260417T052318.491%20GMT">Appendix S - DSI incl. Review of ORAP</a></li>
 <li><a href="https://majorprojects.planningportal.nsw.gov.au/prweb/PRRestService/mp/01/getContent?AttachRef=SSD-93222706%2120260417T052317.902%20GMT">Appendix T - Remediation Action Plan</a></li>
 <li><a href="https://majorprojects.planningportal.nsw.gov.au/prweb/PRRestService/mp/01/getContent?AttachRef=SSD-93222706%2120260417T052320.230%20GMT">Appendix U - Stormwater Management Plan</a></li>
 <li><a href="https://majorprojects.planningportal.nsw.gov.au/prweb/PRRestService/mp/01/getContent?AttachRef=SSD-93222706%2120260417T052314.939%20GMT">Appendix V - Historical Archaeological Assessment</a></li>
 <li><a href="https://majorprojects.planningportal.nsw.gov.au/prweb/PRRestService/mp/01/getContent?AttachRef=SSD-93222706%2120260417T052315.835%20GMT">Appendix W - Archaeological Technical Report</a></li>
 <li><a href="https://majorprojects.planningportal.nsw.gov.au/prweb/PRRestService/mp/01/getContent?AttachRef=SSD-93222706%2120260417T052315.529%20GMT">Appendix X - Statement of Heritage Impact</a></li>
 <li><a href="https://majorprojects.planningportal.nsw.gov.au/prweb/PRRestService/mp/01/getContent?AttachRef=SSD-93222706%2120260421T032524.073%20GMT">Appendix Y - ACHAR (Public)</a></li>
 <li><a href="https://majorprojects.planningportal.nsw.gov.au/prweb/PRRestService/mp/01/getContent?AttachRef=SSD-93222706%2120260417T052317.386%20GMT">Appendix Z - Infrastructure Delivery and Staging
     Plan</a></li>
 <li><a href="https://majorprojects.planningportal.nsw.gov.au/prweb/PRRestService/mp/01/getContent?AttachRef=SSD-93222706%2120260417T051445.439%20GMT">Appendix AA - Flood Impact and Risk Assessment</a></li>
 <li><a href="https://majorprojects.planningportal.nsw.gov.au/prweb/PRRestService/mp/01/getContent?AttachRef=SSD-93222706%2120260417T051441.772%20GMT">Appendix BB - Preliminary Noise Vibration Impact
     Assessment</a></li>
 <li><a href="https://majorprojects.planningportal.nsw.gov.au/prweb/PRRestService/mp/01/getContent?AttachRef=SSD-93222706%2120260417T051443.679%20GMT">Appendix CC - Transport Impact Assessment</a></li>
 <li><a href="https://majorprojects.planningportal.nsw.gov.au/prweb/PRRestService/mp/01/getContent?AttachRef=SSD-93222706%2120260417T051442.084%20GMT">Appendix DD - Waste Management Plan</a></li>
 <li><a href="https://majorprojects.planningportal.nsw.gov.au/prweb/PRRestService/mp/01/getContent?AttachRef=SSD-93222706%2120260417T051441.515%20GMT">Appendix EE Social Impact Assessment</a></li>
 <li><a href="https://majorprojects.planningportal.nsw.gov.au/prweb/PRRestService/mp/01/getContent?AttachRef=SSD-93222706%2120260417T051441.292%20GMT">Appendix EE - Social Impact Management Plan</a></li>
 <li><a href="https://majorprojects.planningportal.nsw.gov.au/prweb/PRRestService/mp/01/getContent?AttachRef=SSD-93222706%2120260417T051657.207%20GMT">Appendix FF - ESD Report</a></li>
 <li><a href="https://majorprojects.planningportal.nsw.gov.au/prweb/PRRestService/mp/01/getContent?AttachRef=SSD-93222706%2120260417T051657.452%20GMT">Appendix GG - Aviation Impact Assessment</a></li>
 <li><a href="https://majorprojects.planningportal.nsw.gov.au/prweb/PRRestService/mp/01/getContent?AttachRef=SSD-93222706%2120260417T051656.971%20GMT">Appendix HH - Accessibility Assessment</a></li>
 <li><a href="https://majorprojects.planningportal.nsw.gov.au/prweb/PRRestService/mp/01/getContent?AttachRef=SSD-93222706%2120260417T051656.510%20GMT">Appendix II - EDC Summary Letter</a></li>
 <li><a href="https://majorprojects.planningportal.nsw.gov.au/prweb/PRRestService/mp/01/getContent?AttachRef=SSD-93222706%2120260417T051657.700%20GMT">Appendix JJ - Concept Envelope Plans</a></li>
 <li><a href="https://majorprojects.planningportal.nsw.gov.au/prweb/PRRestService/mp/01/getContent?AttachRef=SSD-93222706%2120260417T052311.846%20GMT">Appendix KK - Rezoning Report</a></li>
 <li><a href="https://majorprojects.planningportal.nsw.gov.au/prweb/PRRestService/mp/01/getContent?AttachRef=SSD-93222706%2120260417T052311.160%20GMT">Appendix KK - Attach A - Draft LEP Maps</a></li>
 <li><a href="https://majorprojects.planningportal.nsw.gov.au/prweb/PRRestService/mp/01/getContent?AttachRef=SSD-93222706%2120260417T052312.892%20GMT">Appendix KK - Attach B - Revised Design Guide</a></li>
 <li><a href="https://majorprojects.planningportal.nsw.gov.au/prweb/PRRestService/mp/01/getContent?AttachRef=SSD-93222706%2120260417T052313.211%20GMT">Appendix KK - Attach C - Connecting with Country
     Framework</a></li>
 <li><a href="https://majorprojects.planningportal.nsw.gov.au/prweb/PRRestService/mp/01/getContent?AttachRef=SSD-93222706%2120260417T052311.569%20GMT">Appendix KK - Attach D - Retail Market Demand
     Assessment</a></li>
 <li><a href="https://majorprojects.planningportal.nsw.gov.au/prweb/PRRestService/mp/01/getContent?AttachRef=SSD-93222706%2120260417T053714.410%20GMT">Application_20260417053618</a></li></ul>
<p>At the top of the exhibition page is a
link to “<a href="https://majorprojects.planningportal.nsw.gov.au/prweb/IAC?pyActivity=@baseclass.LaunchOnlineSubmission&ExhibitionID=EXH-118380239">Make a submission</a>”. Submissions are supposed
to be made online by <a href="https://www.planningportal.nsw.gov.au/sites/default/files/documents/2022/How%20to%20Create%20an%20Account.pdf">setting up an account in the Planning Portal</a>
if you don’t have one. If you can’t access online then ask for support from one
of the agencies like Counterpoint or from representatives from the Department
of Planning. Department of Planning representatives at the Stockland
information sessions will have a form that can be used by those that cannot
make electronic submissions. There is also a general guide on <a href="https://shared-drupal-s3fs.s3.ap-southeast-2.amazonaws.com/master-test/fapub_pdf/How+to+make+a+submission+on+a+State+significant+application+v3.pdf">how to make submission</a>s.</p>
<p>While the consortium will hold some
information sessions they stand to benefit from the outcome and hence are not
permitted to collect and submit feedback. Submissions must be made directly to
the Department of planning. After all the input from the community and other
agencies, like Council, is received, the Consortium will have a chance to
provide a response and change things before the Department of Planning makes a
final decision on the proposal.</p>
<p>This is the <a class="external-link" href="https://www.nsw.gov.au/ministerial-releases/waterloo-south-application-public-exhibition">official media statement</a>.&nbsp;The SMH reported the exhibition in&nbsp;<a href="https://www.smh.com.au/national/nsw/hundreds-of-inner-sydney-homes-to-be-bulldozed-for-3300-units-20260505-p5ztsh.html">Hundreds of inner Sydney homes to be bulldozed for 3300
units</a>. The initial SMH article wrongly said the first units would not be delivered until 2035 but this has subsequently been corrected to 2030 as confirmed by Stockland at the REDWatch meeting.</p>
<p><a name="_Toc228985827">Social Impact Assessment and Preliminary Social Impact
Management Plan now available</a></p>
<p>Two important Concept Plan documents, from
REDWatch’s perspective, can be found in Appendix EE of exhibition documents.
These are the <a href="https://majorprojects.planningportal.nsw.gov.au/prweb/PRRestService/mp/01/getContent?AttachRef=SSD-93222706%2120260417T051441.515%20GMT">Social
Impact Assessment</a> and the Preliminary <a href="https://majorprojects.planningportal.nsw.gov.au/prweb/PRRestService/mp/01/getContent?AttachRef=SSD-93222706%2120260417T051441.292%20GMT">Social
Impact Management Plan</a>. These reports specifically to look at the
potential impacts both good and bad of the development on the surrounding
community, especially the public housing community and what needs to happen to
manage impacts. These reports also deal with some of the issues raised in Homes
NSW’s People and Place Plan. This report was not available during the
pre-lodgement consultation, so this will be the first time we get to look at
these “people” parts of the redevelopment.</p>
<p>We have asked the Consortium to talk to these
reports at the 7 May REDWatch meeting as well as providing an overview of the
Concept proposal. REDWatch encourages people to look at these reports and raise
any issues of concern.</p>
<h2><a name="_Toc228549895">REDWatch Meeting – Hear
Stockland talk on Waterloo South Concept Plan</a> - 7 May</h2>
<p><a name="_Toc228616397"></a></p>
<p>The
Concept Plan is on exhibition and the May 7 REDWatch meeting will do an initial
unpack of the Waterloo South Concept Plan for tenants and the community. Given
a short 28 days exhibition this will be a two-hour meeting dealing with both
the built environment proposal as well as with the Social Impact Assessment
(SIA). The SIA looks at the people impacts from the redevelopment as part of
the exhibition and this information was not available during the pre-exhibition
consultations.</p>
<p>This is
a public meeting and everyone is welcome. You can join the meeting in person on
7 May from 6:00 pm at Counterpoint’s Factory Community Centre, 67 Raglan
Street, Waterloo or join us on line by Zoom <a name="_Hlk228892406"></a><a href="http://tinyurl.com/RedwatchMeetingZoom">http://tinyurl.com/RedwatchMeetingZoom</a>.</p>
<p>REDWatch
meets at the local Community Centre and is pleased to celebrate Neighbourhood
Centre Week in May as your place to connect.</p>
<h2><a name="_Toc228985829">Information and Support in understanding the Concept &amp;
making submissions</a></h2>
<p>The consortium has revamped its
Waterloo Partnership website at <a href="http://www.waterloorenewal.com.au">www.waterloorenewal.com.au</a> and this site
contains some high-level information on the Concept Proposal including some
updated maps and Q&amp;As. REDWatch suggests you have a look at this site.</p>
<p>The
Consortium have produced a <a href="https://cdn.prod.website-files.com/68e5bd886589104662180f8d/69fa9b97ea995d8bb7a6c372_A%20Community%20Guide%20to%20the%20Concept%20Application%20and%20Rezoning.pdf">Community Guide to the Concept Application and Rezoning</a>,
Please note that <strong>this guide is not part of the formal application</strong>. The
Consortium have produced it as an overview that might be helpful for people
wanting to understand what is in the concept proposal however in the case of
omissions or differences the exhibited documents are what need to be addressed,
primarily the <a href="https://majorprojects.planningportal.nsw.gov.au/prweb/PRRestService/mp/01/getContent?AttachRef=SSD-93222706%2120260417T052316.334%20GMT">Waterloo South Concept Environmental Impact Statement</a>.</p>
<p>Homes NSW has also updated its <a href="https://www.nsw.gov.au/about-nsw/housing-and-infrastructure-projects/social-building-projects/waterloo-renewal-project">Waterloo South site</a> to cover the
exhibition.&nbsp; The Consortium will also
hold some information sessions (see details later in this update).</p>
<p>It should be noted that Homes NSW and
the Consortium have prepared the 40+ documents in this exhibition and hence
have their material available at the beginning of the exhibition. Independent
assessment however will take longer for groups like REDWatch, services agencies
like Counterpoint and City of Sydney Council which need to read and digest the
reports before being able to raise any issues of concern. With this exhibition
being only 28 days it is likely that even Council, with its dedicated planning
staff will be unable to finalise its assessment within that time, let alone
service providers and voluntary groups. As a result, concerns may only emerge
from these independent organisations towards the end of the exhibition.</p>
<p>So please look out for later
statements from community groups about concerns they think should be raised and
please also feed any concerns you have from looking at the documents back to
these independent parties to inform their comments and submissions.</p>
<p>Counterpoint Community Services,
Redfern Legal Centre and Kinchela Boys Home Aboriginal Corporation have been
funded by Council to provide independent advice and support during relocations
and the redevelopment.</p>
<p>With many events during May there will
be lots of opportunities to people to discuss concerns with workers independent
of Homes NSW and the Consortium. Counterpoint in its newsletter says “<em>You
can chat with Counterpoint staff at any of our centres or at these events:
Community Centre Week events; Volunteer Awards; Pet Day; and other
neighbourhood activities across Waterloo. These are informal opportunities to
ask questions, share concerns, or get help finding the right information</em>”.</p>
<p>In this update REDWatch has not sought
to assess the proposal. REDWatch will post material it becomes aware of on <a href="../../../.">www.redwatch.org.au</a>
and / or issue an email update.</p>
<p>Here are some opportunities to attend
activities which will focus on the Concept Plan (please note Events on 12 May and 26 May have been bought forward half an hour on earlier times&nbsp; to minimise conflicts with other activities that these event overlap).</p>
<ul type="disc">
 <li>Thursday 7 May – REDWatch Meeting with Stockland on the Plan 6-8pm
     The Factory 67 Raglan Street Waterloo or on line via <a href="http://tinyurl.com/RedwatchMeetingZoom">http://tinyurl.com/RedwatchMeetingZoom</a>. You can see recording of this session at <a class="external-link" href="https://youtu.be/LqLmw_IjSWg">https://youtu.be/LqLmw_IjSWg</a></li>
 <li>Monday 11 May – Consortium Service Provider Briefing from 3pm to 4pm</li>
 <li>Tuesday 12 May – Consortium in person 10 am to 12.30pm (lunch
     included) Waterloo Neighbourhood Centre 95 Wellington Street (opposite
     OzHarvest)</li>
 <li>Saturday 16 May – Consortium Drop-in 10am to 12pm Chinese and
     Russian language interpreters will be available during this time</li>
 <li>Monday 18 May – Consortium Online session - 5pm to 6.30pm Register
     via the project website or email the Consortium for the meeting link</li>
 <li>Wednesday 20 May – Waterloo Redevelopment Group 2pm The Factory, 67
     Raglan St, Waterloo</li>
 <li>Tuesday 26 May – Consortium morning tea with the team - Drop in
     between 10am and 12.30pm at Waterloo Connect Shop 2, 95 Wellington St
     (opposite OzHarvest) to speak to the team. </li>
 <li>Monday to Friday during exhibition – Consortium Drop-in to Waterloo
     Connect Shop 2, 95 Wellington St, Waterloo (opposite OzHarvest) or Connect
     with Homes NSW and the Consortium by calling 1800 997 318 Email:
     hello@waterloorenewal.com.au</li></ul>
<h2><a name="_Toc228985830">What is the Concept Plan and Rezoning?</a></h2>
<p>The total floorspace for this site was
set in 2022. During the pre-lodgement consultation the developer, Stockland,
discussed the need to change how that floorspace is distributed, changing
heights and creating more ground level space, as well as showing where
different sorts of housing go. This exhibition will change the planning
controls that Stockland will then build within. Even though 10% design
excellence bonus was added on top of the expected 3,000 units in the
development in 2022 it has taken until now for Homes NSW and the Consortium to
use the 3,300-unit figure. Even this is an estimate, as the planning controls
divide the floorspace between tenures, not the number of units so how many
units are delivered for that floor space will be determined by later planning.</p>
<p>The submission of the Concept Proposal
to the Department of Planning says the proposal expects Waterloo South to
provide 5650 rooms holding 7,000 people with a delivery cost excluding GST of
AUD2,231,118,316.00. The development is expected to provide 1,781 construction
jobs and 600 operation jobs.</p>
<p>The exhibition will show how the
heights and floorspace distribution changes proposed differ from the approved
2022 controls. It will also include other information such as the distribution
of different types of housing tenure, staging etc. Stockland has undertaken
pre-lodgement consultation with tenants showing what it was considering, so
there should be few major surprises in the key elements of the exhibited plan
for those who were involved in the earlier consultation.</p>
<p>The formal exhibition does include a
lot of unseen technical studies that are likely to be of interest. They cover
wind, sun, shadowing. environmental issues, social impacts etc. (see full list
earlier in this email)</p>
<p>You can also find out more about the
concept application and zoning in Q&amp;As on the Consortium’s&nbsp; <a href="https://www.waterloorenewal.com.au/planning/concept-application-and-rezoning">Concept Application and Rezoning</a> page.</p>
<p>You can see Stockland presentation to REDWatch of the Concept Plan on YouTube at&nbsp;<a class="external-link" href="https://youtu.be/LqLmw_IjSWg">https://youtu.be/LqLmw_IjSWg</a></p>
<h2><a name="_Toc228985831">Scoping Applications for Development Applications for Stage
1 Waterloo South Lodged</a></h2>
<p>The Homes NSW Waterloo Project website
has been updated to advise that while this exhibition is underway, three
scoping reports have been lodged with the Department of Planning, Housing and
Infrastructure to obtain the Secretary’s Environmental Assessment Requirements
(SEARs) for early works, Block 8 and Block 9. The SEARs will set out what
studies must be completed and which stakeholders and community members must be
consulted. Early engagement with the community will begin soon, to help inform
the detailed applications.</p>
<p>REDWatch - Updated 9 May 2026</p>
]]></content:encoded>
    <dc:publisher>No publisher</dc:publisher>
    <dc:creator>REDWatch</dc:creator>
    <dc:rights></dc:rights>
    <dc:date>2026-05-09T03:00:00Z</dc:date>
    <dc:type>News Item</dc:type>
  </item>


  <item rdf:about="http://www.redwatch.org.au/RWA/Waterloo/stage1/260507hnsw">
    <title>First look at new Waterloo South as renewal enters next stage</title>
    <link>http://www.redwatch.org.au/RWA/Waterloo/stage1/260507hnsw</link>
    <description>This is the text of the media release issued by the Minister for Homelessness, Minister for Housing, Minister for Planning and Public Spaces on 7 May 2026 regarding the Waterloo South Renewal following the commencement of public exhibition of the Concept Plan and Rezoning.</description>
    <content:encoded xmlns:content="http://purl.org/rss/1.0/modules/content/"><![CDATA[
<p><strong>The Minns Labor Government is taking the next step in the renewal of Waterloo South with a concept development and rezoning application now on public exhibition.</strong></p>
<div class="nsw-block">
<div class="nsw-wysiwyg-content">
<p>Waterloo South is Australia’s largest and most transformative public housing renewal and a cornerstone of the NSW Government’s historic $6.6 billion Building Homes for NSW program, which will deliver:</p>
<ul><li>8,400 new public homes</li><li>21,000 new affordable and private homes</li><li>Upgrades to 30,000 existing social housing properties</li></ul>
<p>The proposal sets out a vision for a vibrant new inner-city neighbourhood that could enable around 3,300 new homes, where at least half would be delivered as social or affordable housing.</p>
<p>This will more than double the number of social and affordable homes currently on the site.</p>
<p>Central to the proposal are two new public parks, including a two-hectare main park and a 1,000 square metre community park, which will form the heart of the new Waterloo South and provide welcoming places for people to relax, gather and connect on Gadigal land.</p>
<p>The new homes will sit alongside transport, local shops and cafés, a new supermarket, essential services, and community facilities designed to support health, wellbeing and social connection.</p>
<p>First announced in 2015, the Waterloo South renewal stalled for years, with little progress until 2022. Since our election in 2023, we’ve turned vision into action by increasing public and affordable housing to 50 per cent, fully funding the project, completing the first stage of relocations, lodging the Concept SSDA and now moving toward demolition and delivery.<br /><br />To enable this transformation, Homes NSW and Stockland, the lead delivery partner, have now lodged a Concept State Significant Development Application (SSDA).</p>
<p>While Waterloo South was initially rezoned in 2022, a new rezoning will be lodged at the same time, proposing minor updates to ensure they align with the Concept SSDA.</p>
<p>The Department of Planning, Housing and Infrastructure (DPHI) will now assess a combined rezoning and Concept SSDA.</p>
<p>The Waterloo South renewal will be delivered in stages over the coming years to support a carefully managed transition for existing residents.</p>
<p>Some residents in the first stage of relocations have already moved into brand new homes at the Waterloo Metro Quarter and Boronia apartments.</p>
<p>Any residents required to relocate for the renewal will be given at least six months’ written notice before needing to move and will be supported throughout the process.</p>
<p>The proposal is currently on public exhibition and members of the community are encouraged to provide feedback until Tuesday, 2 June 2026.</p>
<p>For more information and to make a submission, please visit: <a class="is-external" href="https://www.planningportal.nsw.gov.au/major-projects/projects/waterloo-estate-south-concept" rel="noreferrer nofollow" target="_blank">planningportal.nsw.gov.au</a></p>
<p><strong>Quotes attributable to Minister for Planning and Public Spaces Paul Scully:</strong></p>
<p>“This concept DA brings thousands of new public, affordable and market homes on the doorstep of the Waterloo Metro station another step closer to reality.</p>
<p>“Importantly, alongside the new homes the plan also proposes new open space where residents and the broader community can gather, relax and play.</p>
<p>“The Waterloo South renewal is a project that will reshape the area for decades to come so I encourage people to view the plans and share their feedback during the exhibition period.”</p>
<p><strong>Quotes attributable to Minister for Housing and Homelessness Rose Jackson:</strong></p>
<p>“This is one of the most significant housing renewals in the country and I’m thrilled to be moving into the next stage, offering the community their first look at the new Waterloo South.</p>
<p>“When we came to government, we immediately reviewed the plans for the Waterloo renewal and boosted the number of public and affordable homes from 35 to 50 per cent. This was a crucial step to ensure Waterloo remains a welcoming place for people from all walks of life to call home now and into the future.</p>
<p>“We know how important this project is to the community and we want to hear from residents to help shape what comes next.</p>
<p>“There is no time to waste in a housing crisis. I feel that urgency every day and I’m looking forward to moving to the next stage of this renewal project that will deliver more than four times the number of homes currently on this site.”</p>
<p><strong>Quotes attributable to Stockland Managing Director and CEO Tarun Gupta:</strong></p>
<p>“As delivery partner, Stockland is proud to be working with the NSW Government on the renewal of Waterloo South – a significant project with community at its heart.</p>
<p>“The Concept Plan sets the framework for a liveable and inclusive neighbourhood with new social, affordable and market housing, supported by parks, services and community infrastructure.</p>
<p>“We look forward to continuing to work closely with Homes NSW and our community housing partners to deliver a place where the community can thrive over the long term.”</p>
<p>Source:&nbsp;<a class="external-link" href="https://www.nsw.gov.au/ministerial-releases/waterloo-south-application-public-exhibition">https://www.nsw.gov.au/ministerial-releases/waterloo-south-application-public-exhibition</a></p>
</div>
</div>
]]></content:encoded>
    <dc:publisher>No publisher</dc:publisher>
    <dc:creator>REDWatch</dc:creator>
    <dc:rights></dc:rights>
    <dc:date>2026-05-07T02:44:05Z</dc:date>
    <dc:type>News Item</dc:type>
  </item>


  <item rdf:about="http://www.redwatch.org.au/RWA/Waterloo/stage1/260429dphi">
    <title>DPHI Waterloo South Concept Notification OCR</title>
    <link>http://www.redwatch.org.au/RWA/Waterloo/stage1/260429dphi</link>
    <description>This letter was sent by the Department of Planning Housing and Infrastructure to Waterloo Estate and surrounds to notify commencement of the Waterloo South Concept Plan and Rezoning. This document has been OCRed for easier access but please check copy against visual text.</description>
    
    <dc:publisher>No publisher</dc:publisher>
    <dc:creator>REDWatch</dc:creator>
    <dc:rights></dc:rights>
    <dc:date>2026-05-06T10:01:42Z</dc:date>
    <dc:type>File</dc:type>
  </item>


  <item rdf:about="http://www.redwatch.org.au/RWA/Waterloo/stage1/260501hnsw">
    <title>Homes NSW notification to Waterloo tenants of Concept Plan Exhibition - 1 May 2026</title>
    <link>http://www.redwatch.org.au/RWA/Waterloo/stage1/260501hnsw</link>
    <description>This is the information circulated to Waterloo public housing tenants to advise them of the immanent Waterloo South Concept and Rezoning application. In line with Homes NSW policy impacted public housing tenants were advise in advance of the public notification of the exhibition. </description>
    
    <dc:publisher>No publisher</dc:publisher>
    <dc:creator>REDWatch</dc:creator>
    <dc:rights></dc:rights>
    <dc:date>2026-05-05T06:40:54Z</dc:date>
    <dc:type>File</dc:type>
  </item>


  <item rdf:about="http://www.redwatch.org.au/RWA/Waterloo/stage1/260420cm">
    <title>Clover Moore to Rose Jackson on Waterloo South People and Place Plan and relocation support 20 Apr 2026</title>
    <link>http://www.redwatch.org.au/RWA/Waterloo/stage1/260420cm</link>
    <description>This is an OCR copy of the Sydney Lord Mayor, Clover Moore letter to Housing Minister Rose Jackson of 20 April 2026, setting out Council’s concerns about the Waterloo People and Place Plan and raising concerns about relocation support. The Lord mayor included a comparative analysis of the issues raised by Council in its submission and the final plan which is also attached. </description>
    
    <dc:publisher>No publisher</dc:publisher>
    <dc:creator>REDWatch</dc:creator>
    <dc:rights></dc:rights>
    <dc:date>2026-04-30T07:29:49Z</dc:date>
    <dc:type>File</dc:type>
  </item>


  <item rdf:about="http://www.redwatch.org.au/RWA/Waterloo/stage1/260219stk">
    <title>Stockland Waterloo Renewal Briefing Feb 2026</title>
    <link>http://www.redwatch.org.au/RWA/Waterloo/stage1/260219stk</link>
    <description>This presentation covers content shared with both Service Providers in February and public housing tenants as part of the Waterloo Redevelopment Group in February and March 2026. It provides an overview of some of the key things Stockland heard during its pre-lodgement consultation on the Concept Plan. It also provides an excellent foreshadowing of what is expected to happen regarding planning for the redevelopment for the remainder of 2026. Such material should be made publicly available to everybody on the www.waterloorenewal.com.au website rather than being left to REDWatch to make such basic information more widely available. PDF 3MB</description>
    
    <dc:publisher>No publisher</dc:publisher>
    <dc:creator>REDWatch</dc:creator>
    <dc:rights></dc:rights>
    <dc:date>2026-03-31T04:27:37Z</dc:date>
    <dc:type>File</dc:type>
  </item>


  <item rdf:about="http://www.redwatch.org.au/RWA/Waterloo/stage1/260313wrgt">
    <title>Maintaining funding for independent relocation advocacy for tenants in the Waterloo Redevelopment Area</title>
    <link>http://www.redwatch.org.au/RWA/Waterloo/stage1/260313wrgt</link>
    <description>This is a copy of the letter of 13 March 2026 sent by Waterloo Redevelopment Group tenants to Minister Rose Jackson following the decision by Homes NSW to cease funding for tenancy advocacy during the Waterloo relocations. </description>
    
    <dc:publisher>No publisher</dc:publisher>
    <dc:creator>REDWatch</dc:creator>
    <dc:rights></dc:rights>
    <dc:date>2026-03-30T02:03:35Z</dc:date>
    <dc:type>File</dc:type>
  </item>


  <item rdf:about="http://www.redwatch.org.au/RWA/Waterloo/stage1/260308redw">
    <title>South Eveleigh to Waterloo Metro walking and cycling improvements REDWatch Submission – March 2026</title>
    <link>http://www.redwatch.org.au/RWA/Waterloo/stage1/260308redw</link>
    <description>This submission was made to the City of Sydney regarding its South Eveleigh to Waterloo Metro walking and cycling improvements Exhibition in March 2026. The REDWatch submission is based on feedback through our social media, participation in community meetings and after holding a public meeting on 5 March 2026, where community members were able to raise issues with the Manager Transport Planning from the City of Sydney. The submission covers not just the exhibited proposal but issues raised that are part of the wider context and implications of the proposed change. The submission primarily deals with Waterloo impacts of concern to the public housing community.</description>
    <content:encoded xmlns:content="http://purl.org/rss/1.0/modules/content/"><![CDATA[
<h2 style="text-align: left;">REDWatch Background</h2>
<p>This
submission is made on behalf of REDWatch Incorporated (REDWatch). REDWatch was
set up in 2004 with the following objects in its constitution:</p>
<p><em>REDWatch
is a group of community residents and friends from Redfern, Waterloo, Eveleigh
and Darlington who support the existing diversity in these areas and wish to
promote sustainable, responsible economic and social development.</em></p>
<p><em>REDWatch
recognises the importance of the Aboriginal community to the area.</em></p>
<p><em>REDWatch
has been formed to:</em></p>
<p><em>1. Monitor the activities of the
Government (local, state and federal), the Redfern Waterloo Authority, and any
other government instrumentality with responsibility for the Redfern, Waterloo,
Darlington and Eveleigh area, to ensure that:</em></p>
<p><em>&nbsp; &nbsp; &nbsp;(a) The strategy benefits a diverse
community</em></p>
<p><em>&nbsp; &nbsp; &nbsp;(b) Communication and consultation
is comprehensive and responsive</em></p>
<p><em>&nbsp; &nbsp; &nbsp;(c) Pressure is maintained on
authorities</em></p>
<p><em>2. Provide a mechanism for
discussion and action on community issues.</em></p>
<p><em>3. Enhance communication between
community groups and encourage broad community participation.</em></p>
<p><em>This
may involve: Holding regular meetings; Holding community forums and other
events; Establishing a website; Communicating with the community through other
means; Meeting with government representatives and authorities; Cooperating
with other community organisations; And any other means the association deems
appropriate.</em></p>
<p>The
South Eveleigh to Waterloo Metro walking and cycling improvements exhibition
impacts the Redfern and Waterloo communities, including Waterloo public housing
tenants, who are often not involved in these conversations. REDWatch through
our social media, participation in community meetings and holding a public
meeting makes the following submission.</p>
<p>REDWatch
expresses its appreciation to Council for providing Sarah Brickhill to attend
the REDWatch public meeting on March 5 to discuss this and wider traffic issues
and for an extension to make this submission after that meeting.</p>
<h1>What is this proposal about?</h1>
<p>The
exhibited proposal was styled as about “walking and cycling improvements”. It
is certainly about improvement for cycling, the assertion that it makes “walking
more comfortable along Henderson Road and Raglan Street” is however not
discussed nor demonstrated as it is not clear how this proposal assists
walkability and in fact seems to remove some footpath space outside the Metro with
new verge plantings and does not examine light timing and surge footpath
requirements.</p>
<p>The
project however is also about prioritising buses and removing vehicle access
from Botany Road and Henderson Road into Raglan Street. Without these changes
the proposal would just be about cycling and walking improvements and would be
better able to fit into the project area.</p>
<h1>Wider Context to proposal and this submission</h1>
<p>At
the REDWatch meeting the need to assess the proposal in its wider context was evident.
Such project proposals draw a line around the area and do not look at outside ramifications
in any detail. Issues were raised at the meeting about how these changes
interact with other changes in Erskineville and with how people from Alexandria
move into Waterloo. There was discussion about the need for projects to be seen
in a more regional context and for the interactions between this project and
its implications to be made transparent.</p>
<p>A
number of issues raised at the meeting were outside the current direct scope of
the proposal but either interacted with it or were exacerbated by it. These
issues are hence considered relevant to providing comprehensive feedback on the
project proposal.</p>
<p>REDWatch
understands that the current consultation is an early-stage proposal and hence
encourages Council’s bike, pedestrian and traffic teams to consider the wider
issues raised by the community about the proposed project. As the community has
not been able to talk directly with TfNSW about its elements in the plan we urge
Council to take these community concerns up with TfNSW on the community’s
behalf.</p>
<p>As
this project directly impacts residents on the Waterloo public housing estate
both in terms of location and impacts, REDWatch requests Council carefully
apply an equity lens over this project to ensure that the public housing
community isn’t adversely impacted and that the needs and desires of the public
housing community are given appropriate weight.</p>
<h1>Traffic refunneling</h1>
<p>Introducing
major traffic changes under the guise of cycling and pedestrian improvements
are fraught as the changes have ramifications outside the scope of the
exhibited project. What do these changes mean for east west movements in
Alexandria and Waterloo and north south movements through Redfern? None of this
wider work was available to help people assess the impacts.</p>
<p>Given
the proposed redevelopment of Waterloo South to accommodate around 2,500 extra homes
and subsequent redevelopment of the north and central parts of the estate to add
a further 2,000 homes there is a need for wider traffic modelling if the main
thoroughfare is to be Wellington Street. While the Council argued that the
streets could handle the change this was not demonstrated.</p>
<p>Stockland
are in the process of doing traffic modelling for the Waterloo South
redevelopment and along with Homes NSW were not aware of the proposed traffic
changes.</p>
<p>At a
community level the proposed closure of Raglan Street to general traffic and
the funnelling of traffic through Wellington Street reawakened concerns that Pitt
Street being opened to McEvoy might again be considered to cope with the
traffic generated by the Waterloo South redevelopment. This proposal had
earlier been dismissed in the 2022 rezoning.</p>
<p>Closing
Raglan Street to traffic puts the discussion about the capacity and issues
within Wellington Street as that flows from the proposal. People at the meeting
raised concerns about the impact on pedestrians, cyclists and cars from stop
signs being changed at the corner of George Street and Wellington to give
Wellington Street priority.</p>
<p>Of
concern was the lack of visibility on Wellington Street heading west at the
corner of George Street. The earlier stop sign meant that cars had to stop and
could see bikes and pedestrians. Given the location in the middle of an estate
with many older and disadvantaged people there were also concerns about
pedestrian safety both for motor vehicles as well as bikes on the existing bike
path. A suggestion for this intersection to have a scatter crossing has been
made.</p>
<p>Concerns
were also raised about queueing and turns out of Wellington into Botany Road
and also Elizabeth Street. This is particularly an issue at school times when
children from Mount Carmel or Alexandria Park are moving through those intersections.</p>
<p>Problems
on Wellington Street are expected to become worse if traffic into Waterloo
South is channelled through Wellington Street with access closed to Raglan
Street. In the short term this will also be the route for demolition and
construction vehicles, and concerns were also raised about potential road
closures in the street during construction if this was the main throughfare.</p>
<p>While
Wellington will take the bulk of the traffic from the east, south and west, it
is expected that closing Raglan Street will also lead to more traffic through
Redfern from the north with traffic needing to go down Pitt and to a lesser
extent George Street.</p>
<p>Questions
were also raised about the impact of the proposed Raglan Street closure on the
Cope Street kiss and ride. It was suggested that people are unlikely to use the
kiss and ride if they cannot easily get back onto the main road and are hence
more likely to do drop offs in easier locations impacting traffic movements.</p>
<p>All
this seems out of scope of the exhibited proposal, but at a community level is
very much part of the discussion as the proposal required the existing traffic
using Raglan Street to go somewhere.</p>
<h1>Bus issues</h1>
<p>The
creation of the bus only section in Raglan Street opposite the Metro reignited
the debate about the appropriateness of the 392 bus route on Raglan Street east
of Pitt Street which was introduced 6-7 years ago rather than buses being
routed via Wellington Street as was the case with the 355 bus route. Raglan
Street east has many heritage properties facing onto a hill with noise and
vibration concerns – see this <a href="https://9now.nine.com.au/a-current-affair/sydney-locals-tired-of-hundreds-of-buses-driving-past-their-doorstep-every-day/67f5c654-bc30-42fc-bec8-4f0766af46eb#:~:text=A%20group%20of%20residents%20in,A%20Current%20Affair)">Current Affair story</a>
about the issues which were raised at the meeting.</p>
<p>Local
residents also complain that allowing buses to make a right turn from Elizabeth
Street into Raglan against the no right turn sign, locals argued that this has
encouraged many cars to follow suit. For cars this intersection is supposed to
be only left in and left out.</p>
<p>At
the meeting concerns were raised about what appeared to be the movement of the
Raglan Street bus stop to in front of the Metro. The point was made that if the
stop was moved to the Metro then tenants would have to walk up and down the
hill to get from their homes to the bus and that local mobility needed to be
considered not just for people getting on and off the Metro. This is especially
a concern given the mobility concerns for aged and disabled people among the
public housing tenants on the estate. These are clearly walking issues that are
within scope if the proposal includes the relocation of any of the Raglan
Street bus stops.</p>
<p>While
TfNSW fed into the exhibited plans, it was not in attendance to answer
questions about the changes it had proposed in the plan and its implication for
its services. It is not helpful for the community to be told that it is a TfNSW
issue when its elements are included in a City of Sydney exhibited plan without
proper explanation.</p>
<h1>Bike Issues</h1>
<p>The
missing link in the George Street Cycleway is also appears out of scope. This
was caused by the 1970s closure of George Street as part of the Endeavour
public housing project. Council have been unable to negotiate a solution with
Homes NSW for the bike path to continue across Waterloo Green which is LAHC
owned land.</p>
<p>This
sees a dedicated cycleway to the North and South of Waterloo Green with a
nominal “low traffic street or bike lane” around LAHC land via Raglan, Cope and
Phillip Streets to join the dedicated paths. In practice cyclists do not
dismount or use the alternative path but continue to ride across Waterloo
Green.</p>
<p>It
seems unlikely that Homes NSW will allow a separated bike path across its land
until Waterloo North is redeveloped and potentially George Street is reopened.
Thought needs to be given as to what might happen over the next 10-20 years
until this might happen.</p>
<p>Linking
the Henderson Street cycle path to George Street next to Waterloo Green will
increase the number of people who cycle across Waterloo Green rather than
dismount and walk across.</p>
<p><a name="_heading=h.rnrpjdtmuui5"></a>There is an opportunity with the proposed cycleway to
encourage cyclists to use the other two legs of the bike route via Cope Street
north of Raglan and Phillip Street to access the northern section of the George
Street cycleway. As earlier stated, this route already appears as a “low
traffic street or bike lane” on the Council’s cycling map and it should be
formalised and positively encouraged.</p>
<p>Alongside
this, tenants are looking to Council to actively discourage bike riding across
Waterloo Green along with education and enforcement measures. This issue cannot
be ignored and should not be considered out of scope. One way of doing this is
to not provide an easy exit off the bike path towards Waterloo Green as well as
well-placed signs in both directions where the two cycleways meet.</p>
<p>At
the meeting people raised concerns about the viability of cyclists heading south
on George Street north of Phillip Street. Concern was raised about the height
of plantings and the need for regular maintenance. There was also concern about
both the visibility and speed of bikes to cars on Phillip Street and of bikes
entering LAHC land, often at high-speed coming down the hill.</p>
<p>Directing
bikes to the Phillip Street low traffic street / bike path would also enable
the redirection of bikes away from Waterloo Green and the issues raised by
tenants at this location to be addressed.</p>
<p>Also
considered out of scope were community questions about why the bike path was
going down Raglan Street when Wellington Street is already on cycle maps as a
“low traffic street or bike lane” shown on Council’s cycling map which links
through to Mitchell Road and Erskineville. Channelling bikes through the high
traffic Henderson, Wyndham Botany Road intersections was seen as a higher risk
alternative to using the bike route down Wellington past Alexandria Park.</p>
<p>While
we see the problem with the Henderson Road bike path not connecting, the
preferred link for this path is the connection between Railway Parade and
Wilson Street via Alexander Street and Locomotive Street. The dream of this
connection was on the cover of an earlier City of Sydney Cycling Plan.</p>
<p>REDWatch
with FOE and ARAG have recently formed the Eveleigh Bridge Alliance to expand
the push for a pedestrian and cycle bridge across the railway corridor near
Carriageworks. The first action of the Eveleigh Bridge Alliance was to <a href="RWA/statesignificant/northeveleigh/bridge/260211tfnswgipa/view">access documents with a GIPA application</a> which shows TfNSW in June 2025 decided on a preferred
location for a bridge and a way to construct it. Council has long supported a
potential Cycle and Pedestrian Bridge at this location and with some of the
technical issues addressed to some extent the possibility for this connection
between the Henderson Street and Wilson Street Cycleways may still be
achievable.</p>
<p>REDWatch
encourages Council to consider all the issues raised above as related to the
exhibition and to investigate how they can be addressed.</p>
<h1>Comments on the Exhibited Plan</h1>
<p><a name="_heading=h.fexxu5amahmi"></a>In commenting on the proposal as set out we will do so in
relation to separate elements, the Bike Path, traffic changes to deliver the
path, the Raglan bus only proposal and walkability. REDWatch’s comments reflect
issues raised that need to be explored in further development work.</p>
<h1>The Bike path</h1>
<p>There
is strong support from cyclists for the connection of the Henderson Cycleway to
the George Street Cycleway. There is also strong support from cyclists for the
George Street cycleway to extend across Waterloo Green which is opposed by
public housing tenants on safety grounds.</p>
<p>On
the flip side there is strong concern about the impact of the proposal from the
loss of so much scarce inner-city parking and how that might impact local
residents, visitors and deliveries. Special concerns were raised in relation to
loading zones near the Waterloo shops and the Abbotts Hotel which can only get
deliveries in Raglan Street.</p>
<p>Concern
was also raised about access to parking for those delivering services and
visiting those in public housing. It was however recognised that a lot of
parking in the area in unrestricted parking was from people parking and then
going to work.</p>
<p>Earlier
in our submission we have raised issues about the proposal increasing the
number of people who ride across Waterloo Green. To minimise this REDWatch has
suggested that the bike connection in Cope Street north of Raglan be encouraged
at the link to the Redfern end of the George Street cycleway via Phillip
Street.</p>
<p>We
have also proposed that the Bike path in Raglan and Phillip with George not
facilitate easy access off the bike path to the pedestrian path across Waterloo
Green. At both places where the George Street cycleway leads onto LAHC land we
request clear signage to stop bikes and direct them via Cope Street which is
the formal link shown on Council’s bike path maps.</p>
<p>REDWatch
is sure Council will get lots of submissions both supporting the bike path and
raising its impacts on those who are directly impacted. Council will need to
weigh up the impacts and find solutions that lessen the bike lane impact on
local residents and businesses for this to proceed.</p>
<h1>Traffic changes to deliver the path</h1>
<p>Concern
has been raised about the traffic changes needed to facilitate the bike lane in
Henderson Road. At the REDWatch meeting there was concern that at high road use
times the restriction on two lanes turning from Mitchell Road into Henderson
Road will be problematic. It is not clear why Henderson Road has only one east
bound lane at Davey Road when it becomes 2 lanes within the next block.</p>
<p>As
traffic heading onto or across Botany Road is expected to be similar to the
present, it is not clear if a single lane will be adequate in Henderson Road at
Botany Road. It might be adequate if all traffic has to turn right and there
are not greater pedestrian crossing delays. If motor vehicles are allowed to
continue onto Raglan Street then the existing delays in being able to turn
right will impact through traffic which is solved by the current two lanes.</p>
<p>The
community would like the City of Sydney to complete traffic modelling on the
proposed changes and the flow on impacts before finalising the proposal.</p>
<h1>Raglan bus only proposal</h1>
<p>There
is concern about the aspect of the proposal that makes Raglan Street into a bus
only zone as the community has not seen any modelling of this change and its
impacts. While the change directly means that traffic which approaches Raglan
Street from Henderson Road will have to turn right and use Wellington Street,
this will also increase traffic through Pitt and to a lesser extent George
Street Redfern.</p>
<p>While
the change may stop cars to and from Alexandria and Erskineville using Raglan
Street to get to Elizabeth Street which some locals consider a rat run, its
closure means that travel times for those trips will also increase, putting
more car minutes and congestion on the road for those who need to use a car.</p>
<p>We
have highlighted earlier some of the community concerns about the impact on
Wellington Street and public housing tenant concerns.</p>
<p>Council
should consider the possibility of Raglan Street remaining open to motor
vehicles even if the bike lane proceeds. If the proposal proceeds as currently
drafted then the wider traffic impacts need to be assessed and impacts made
transparent alongside what will be done to mitigate the impacts.</p>
<h1>Walkability</h1>
<p>It is
not clear how the current proposal improves walkability. REDWatch has argued
that TfNSW and Council need to address the pedestrian improvements needed on
pedestrian desire lines from the Waterloo Metro. The pathway towards Redfern’s
Southern Concourse and Boundary Street for South Eveleigh are especially
problematic.</p>
<p>While
this proposal claims to be also about pedestrian improvements this is not
evident in the proposal. In fact, the proposal seems to reduce pedestrian space
in some locations such as in front of the Metro. The proposal also does not
assess if the footpath design with grass verges remains appropriate for
pedestrian surges as a result of long light wait times combined with periodic pedestrian
discharges from the station.</p>
<p>The
proposal also does not demonstrate if the traffic changes and potential light
phasing may improve or impact walking times.</p>
<p>Improving
the movement of people from the Metro towards South Eveleigh and Sydney
University should be a major focus of Council.</p>
<p>It
has to be remembered that currently the Bankstown line is not directly connected
to the Metro so it is likely that some people are currently accessing South
Eveleigh via Redfern Station who will remain on the Metro and hence want to
move to South Eveleigh or Sydney University from Waterloo Metro.</p>
<h1>Conclusion</h1>
<p>In
our submission REDWatch has covered broader community concerns inked to the
project proposal that need to also be taken into account in refining the
proposal. We have also raised some concerns about the facets of the exhibited
proposal that we would also like to clarified.</p>
<p>REDWatch
requests Council to take these community concerns into account in its next
steps on this proposal. We also encourage Council to be able to provide clear
impact and remediation proposals for the refined plan so people can assess the
proposal and its surrounding implications.</p>
<p>Thank
you for the opportunity to comment on this proposal and the extension of time
to accommodate this feedback after our meeting.</p>
<p>&nbsp;</p>
<p>Yours Faithfully&nbsp;</p>
<p>Geoffrey Turnbull&nbsp;</p>
<p>Spokesperson&nbsp;</p>
<p>On behalf of REDWatch Inc&nbsp;</p>
<p>c/- Counterpoint Community Services&nbsp;</p>
<p>67 Raglan Street
Waterloo NSW 2017&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</p>
<p>Ph Wk:&nbsp;(02)
8004 1490&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</p>
<p>email: <a href="mailto:mail@redwatch.org.au">mail@redwatch.org.au</a></p>
<p>web: <a href=".">www.redwatch.org.au</a></p>
]]></content:encoded>
    <dc:publisher>No publisher</dc:publisher>
    <dc:creator>REDWatch</dc:creator>
    <dc:rights></dc:rights>
    <dc:date>2026-03-10T02:32:09Z</dc:date>
    <dc:type>News Item</dc:type>
  </item>


  <item rdf:about="http://www.redwatch.org.au/RWA/statesignificant/northeveleigh/bridge/260301ebagipa">
    <title>Eveleigh Pedestrian and Bridge documents revealed</title>
    <link>http://www.redwatch.org.au/RWA/statesignificant/northeveleigh/bridge/260301ebagipa</link>
    <description>Below is some information on the proposed Eveleigh Pedestrian and Cycle Bridge discovered from a Government Information Public Access (GIPA) request for bridge studies since 2020 made by REDWatch on behalf of the Eveleigh Bridge Alliance (EBA). Below is both a brief overview of the what the documents revealed as well as links to key documents and the whole GIPA release. </description>
    <content:encoded xmlns:content="http://purl.org/rss/1.0/modules/content/"><![CDATA[
<div class="WordSection1">
<p>A June 2025 Transport for NSW (TfNSW) ‘Optioneering Report’&nbsp;reveals a preferred Eveleigh bridge concept, location
and an approved way to launch the bridge across the railway corridor.</p>
<p>The preferred bridge would ramp from Wilson Street
Darlington near Carriageworks over the railway corridor to Locomotive Street
South Eveleigh between the Large Erecting Shop and the Locomotive Workshops. It
is not possible to ramp in South Eveleigh and a combination of lifts and
escalators are proposed at that end.</p>
<p>Construction could be by launching a steel truss, bridge
built next to the site in stages across the railway tracks. The process
requires supports at both ends and a permanent pier in the middle. Two
temporary piers are required for construction. A steel trust launch methodology
was developed for the Redfern Station Southern Concourse in 2020 in
consultation with Sydney Trains but was not adopted as it did not result in
savings for that site.</p>
<p>The TfNSW ‘Optioneering Report’ was one of the documents
received when REDWatch on behalf of the Eveleigh Bridge Alliance (EBA) made a
Government Information Public Access (GIPA) request for bridge studies since
2020.</p>
<p>The EBA was formed by REDWatch, Friends of Erskineville
(FOE) and the Alexandria Residents Action Group (ARAG) to kick start a
broad-based community campaign for the delivery of the bridge.</p>
<p>The 338 pages of released documents also include engineering
feasibility studies by ARUP on a number of bridge and tunnel options, a
‘Heritage Assessment’ by Curio Projects and three versions of a ‘Bridge
catchment analysis’ by SCT Consulting. The catchment studies are based on an
earlier option to the east of the Paint shop. Costings of options were not
released.</p>
<p>The EBA was pleased to find that TfNSW continued to assess
options after it ruled a bridge out of scope during the North Eveleigh
rezoning. While TfNSW has addressed some of the major technical barriers its
reports also indicate it does not think that usage of the bridge will be high
enough to justify the expense of building across an active railway corridor.</p>
<p>Media reports indicate that a consortium preparing a bid for
the Paint Shop Precinct in North Eveleigh plan to include a bridge in their bid
to provide sound stages and film studio facilities when the NSW Government
calls for expressions of Interest in March 2026.</p>
<p>The EBA plans to work with surrounding institutions,
businesses and the potential users of the bridge to convince the government
that the bridge, promised in 2004, needs to be delivered one way or another. A
website and social media presence for the EBA is under construction.</p>
</div>
<h2>Looking at the GIPA documents</h2>
<div class="WordSection1">
<p>The GIPA release of documents was made as one large 338 page
PDF that contained some duplication. As&nbsp;well as the full release of documents we have broken
the documents up so that people can access documents that might be of particular interest to them. The breakup of documents are below:</p>
<ul><li><a href="260301gipatfnswpref/view">TfNSW
Preferred Option for Eveleigh Bridge June 2026 (GIPA)</a>&nbsp;—&nbsp;This
extract from the June 2025 Transport for NSW North to South Eveleigh
Optioneering Review v3 extracts the preferred option (Option 4) from the
options review. It also includes information on how the bridge could be
constructed and launched by a process previously agreed with trains NSW. Option
4 links Wilson Street Darlington between Carriageworks and The Paint Shop by a
ramp to the bridge across the railway corridor to a lift and escalators to
Locomotive Street between the Locomotive Workshop and the Large Erecting Shop.
This extract is from documents released under a GIPA request. The full report
Optioneering report with all other options considered also on this website for
completeness.</li><li><a href="260301gipatfnswoptions/view">TfNSW
Optioneering Report for Eveleigh Bridge June 2026 (GIPA)</a>&nbsp;—&nbsp;This
is the June 2025 Transport for NSW North to South Eveleigh Optioneering Review
v3. This review assessed a number of bridge and tunnel options and concluded
that option 4 was the preferred option. It also includes information on how the
bridge could be constructed and launched by a process previously agreed with
trains NSW. Option 4 links Wilson Street Darlington between Carriageworks and
The Paint Shop by a ramp to the bridge across the railway corridor to a lift
and escalators to Locomotive Street between the Locomotive Workshop and the
Large Erecting Shop. This extract is from documents released under a GIPA
request. On this website you will also find an extract of this report just
dealing with Option 4.</li><li><a href="260301gipaheritage/view">Pedestrian
Bridge Heritage Assessment August 2023 (GIPA)</a>&nbsp;—&nbsp;This is
Pedestrian Bridge Heritage Assessment undertaken by Curio Projects for
Transport for NSW in August 2023. It details the heritage impacts, especially
in North Eveleigh for a bridge built from Traverser 1 over which the bridge
would need to be built and the visual and physical impact of ramps on the North
Eveleigh Heritage. The Assessment deals with the location of TfNSW’s 2025
preferred option 4. Heritage NSW approval will be required as part of any
development to build the bridge.</li><li><a href="260301gipacatchment/view">Bridge
Catchment Analysis v 5.0 July 2023 (GIPA)</a>&nbsp;—&nbsp;This is the latest
version (July 2023) of the Redfern North Eveleigh Paint Shop Precinct Bridge
catchment analysis report by SCT Consulting. The GIPA release includes earlier
versions of this report from October 2021 (v1) also quoted by ARUP and an April
2023 v3 report included in an undated ARUP report. The earlier reports can be
found in the full GIPA release on this website. Some projections change between
reports. The original catchment analysis was done in 2021 to assess who would
benefit from the bridge. It includes walking times from 5 to 30 minutes from
Carriage Workshops and Chanel 7 and then compares savings through a bridge and
the Southern Concourse. It also undertakes a bridge demand analysis however the
report does not include the information necessary to understand key diagrams or
to understand the basis for projections. The final section of the report added
in 2023 provides a retail sensitivity analysis for retail added into North
Eveleigh. This report uses an earlier bridge location which is 100m closer to
Redfern station than the June 2025 preferred location, so care needs to be
taken in interpreting this report for the preferred location.</li><li><a href="260301gipaarup/view">Redfern
North Eveleigh Bridge Feasibility Study ARUP (2023)</a>&nbsp;—&nbsp;This
document brings ARUP documents found in two of the GIPA released records. The
first document “Redfern North Eveleigh Crossing” is labelled Record 3, it is
undated but according to the GIPA release letter it is dated 26 July 2023.
Interestingly this is the only document that shows “Facilitate an Innovation
and Collaboration precinct” among the objectives. The second GIPA record is
Record 5 “Redfern North Eveleigh Bridge: Feasibility Study” is undated and
includes the 7 July 2023 SCT Consulting report as well as two ARUP November
2022 studies a “Constraints Review” and a “Feasibility Study and concept
Options Report”. A draft ARUP study report that duplicates material in the
above documents is also in the GIPA release but not in this collection to minimise
duplication. These ARUP studies explore in detail options and assess the
engineering feasibility of the providing the connection and there is
duplication of information between reports. ARUP conclude that “constructing
the bridge will be difficult, expensive and take several years” to build across
the active railway corridor. ARUP uses the SCT Consulting Report to argue it
“does not provide outstanding time savings or convenience for users”.</li></ul>
<p>Alternatively you can explore the full GIPA document release
<a href="260211tfnswgipa/view">TfNSW
Eveleigh Pedestrian Bridge Studies - GIPA release Feb 2026</a>. The following
information from the GIPA release will assist in understanding the Records shown in the
GIPA release.</p>
<table class="MsoNormalTable">
<tbody>
<tr>
<td>
<p>Record Ref.</p>
</td>
<td>
<p>Information</p>
</td>
<td>
<p>Act Ref.</p>
</td>
<td>
<p>Access</p>
</td>
</tr>
<tr>
<td>
<p>1</p>
</td>
<td>
<p>Redfern North
  Eveleigh Paint Shop Precinct: Bridge Catchment Analysis, dated 7 July 2023</p>
<p>Information
  not relevant to the information applied for has been deleted pursuant to section
  74</p>
</td>
<td>
<p>s58(1)(a),</p>
<p>s74</p>
</td>
<td>
<p>Full</p>
</td>
</tr>
<tr>
<td>
<p>2</p>
</td>
<td>
<p>Redfern North
  Eveleigh Bridge: Feasibility Study (Draft), dated 4 July 2023</p>
</td>
<td>
<p>s58(1)(a)</p>
</td>
<td>
<p>Full</p>
</td>
</tr>
<tr>
<td>
<p>3</p>
</td>
<td>
<p>Redfern
  North Eveleigh Crossing, dated 26 July 2023</p>
</td>
<td>
<p>s58(1)(a)</p>
</td>
<td>
<p>Full</p>
</td>
</tr>
<tr>
<td>
<p>4</p>
</td>
<td>
<p>Pedestrian
  Bridge Heritage Assessment, dated 6 August 2023</p>
<p>Information
  not relevant to the information applied for has been deleted pursuant to section
  74</p>
</td>
<td>
<p>s58(1)(a),</p>
<p>s74</p>
</td>
<td>
<p>Full</p>
</td>
</tr>
<tr>
<td>
<p>5</p>
</td>
<td>
<p>Redfern North
  Eveleigh Bridge: Feasibility Study</p>
<p>Information
  not relevant to the information applied for has been deleted pursuant to section
  74</p>
</td>
<td>
<p>s58(1)(a),</p>
<p>s74</p>
</td>
<td>
<p>Full</p>
</td>
</tr>
<tr>
<td>
<p>6</p>
</td>
<td>
<p>Redfern North
  Eveleigh Paint Shop Precinct: Bridge Catchment Analysis, dated 11 October 2021</p>
<p>Information
  not relevant to the information applied for has been deleted pursuant to section
  74</p>
</td>
<td>
<p>s58(1)(a),</p>
<p>s74</p>
</td>
<td>
<p>Full</p>
</td>
</tr>
<tr>
<td>
<p>7</p>
</td>
<td>
<p>Presentation
  titled ‘North to South Eveleigh Active Transport Link: Public Transport Projects-
  Optioneering Review v3’, dated June 2025</p>
<p>Information
  not relevant to the information applied for has been deleted pursuant to section
  74</p>
</td>
<td>
<p>s58(1)(a),</p>
<p>s58(1)(d),</p>
<p>s14 &nbsp;Table cll1(e) &amp; 1(f),</p>
<p>s74</p>
</td>
<td>
<p>Partial</p>
</td>
</tr>
<tr>
<td>
<p>8-10</p>
</td>
<td>
<p>Preliminary
  budget estimates for the development of an active transport link between North
  and South Eveleigh, prepared by WT Partnership</p>
</td>
<td>
<p>s58(1)(d),</p>
<p>s14 &nbsp;Table cll1(e) &amp; 1(f)</p>
</td>
<td>
<p>Refused</p>
</td>
</tr>
</tbody>
</table>
</div>
<p>Geoff Turnbull REDWatch for Eveleigh Bridge Alliance – 1 March
2026.</p>
<p>(Some of this information also appears in the March South Sydney Herald.)</p>
]]></content:encoded>
    <dc:publisher>No publisher</dc:publisher>
    <dc:creator>REDWatch</dc:creator>
    <dc:rights></dc:rights>
    <dc:date>2026-03-01T05:15:00Z</dc:date>
    <dc:type>News Item</dc:type>
  </item>


  <item rdf:about="http://www.redwatch.org.au/RWA/statesignificant/northeveleigh/bridge/260301gipaarup">
    <title>Redfern North Eveleigh Bridge Feasibility Study ARUP 2023 (GIPA)</title>
    <link>http://www.redwatch.org.au/RWA/statesignificant/northeveleigh/bridge/260301gipaarup</link>
    <description>This document brings ARUP documents found in two of the GIPA released records. The first document “Redfern North Eveleigh Crossing” is labelled Record 3, it is undated but according to the GIPA release letter it is dated 26 July 2023. Interestingly this is the only document that shows “Facilitate an Innovation and Collaboration precinct” among the objectives. The second GIPA record is Record 5 “Redfern North Eveleigh Bridge: Feasibility Study” is undated and includes the 7 July 2023 SCT Consulting report as well as two ARUP November 2022 studies a “Constraints Review” and a “Feasibility Study and concept Options Report”. A draft ARUP study report that duplicates material in the above documents is also in the GIPA release but not in this collection to minimise duplication. These ARUP studies explore in detail options and assess the engineering feasibility of the providing the connection and there is duplication of information between reports. ARUP conclude that “constructing the bridge will be difficult, expensive and take several years” to build across the active railway corridor. ARUP uses the SCT Consulting Report to argue it “does not provide outstanding time savings or convenience for users”. </description>
    
    <dc:publisher>No publisher</dc:publisher>
    <dc:creator>REDWatch</dc:creator>
    <dc:rights></dc:rights>
    <dc:date>2026-03-01T05:27:27Z</dc:date>
    <dc:type>File</dc:type>
  </item>


  <item rdf:about="http://www.redwatch.org.au/RWA/statesignificant/northeveleigh/bridge/260301gipatfnswpref">
    <title>TfNSW Preferred Option for Eveleigh Bridge June 2026 (GIPA)</title>
    <link>http://www.redwatch.org.au/RWA/statesignificant/northeveleigh/bridge/260301gipatfnswpref</link>
    <description>This extract from the June 2025 Transport for NSW North to South Eveleigh Optioneering Review v3 extracts the preferred option (Option 4) from the options review. It also includes information on how the bridge could be constructed and launched by a process previously agreed with trains NSW. Option 4 links Wilson Street Darlington between Carriageworks and The Paint Shop by a ramp to the bridge across the railway corridor to a lift and escalators to Locomotive Street between the Locomotive Workshop and the Large Erecting Shop. This extract is from documents released under a GIPA request. The full report Optioneering report with all other options considered also on this website for completeness.</description>
    
    <dc:publisher>No publisher</dc:publisher>
    <dc:creator>REDWatch</dc:creator>
    <dc:rights></dc:rights>
    <dc:date>2026-03-01T05:27:41Z</dc:date>
    <dc:type>File</dc:type>
  </item>


  <item rdf:about="http://www.redwatch.org.au/RWA/statesignificant/northeveleigh/bridge/260301gipatfnswoptions">
    <title>TfNSW Optioneering Report for Eveleigh Bridge June 2026 (GIPA)</title>
    <link>http://www.redwatch.org.au/RWA/statesignificant/northeveleigh/bridge/260301gipatfnswoptions</link>
    <description>This is the June 2025 Transport for NSW North to South Eveleigh Optioneering Review v3. This review assessed a number of bridge and tunnel options and concluded that option 4 was the preferred option. It also includes information on how the bridge could be constructed and launched by a process previously agreed with trains NSW. Option 4 links Wilson Street Darlington between Carriageworks and The Paint Shop by a ramp to the bridge across the railway corridor to a lift and escalators to Locomotive Street between the Locomotive Workshop and the Large Erecting Shop. This extract is from documents released under a GIPA request. On this website you will also find an extract of this report just dealing with Option 4.</description>
    
    <dc:publisher>No publisher</dc:publisher>
    <dc:creator>REDWatch</dc:creator>
    <dc:rights></dc:rights>
    <dc:date>2026-03-01T05:27:29Z</dc:date>
    <dc:type>File</dc:type>
  </item>


  <item rdf:about="http://www.redwatch.org.au/RWA/statesignificant/northeveleigh/bridge/260301gipaheritage">
    <title>Pedestrian Bridge Heritage Assessment August 2023 (GIPA)</title>
    <link>http://www.redwatch.org.au/RWA/statesignificant/northeveleigh/bridge/260301gipaheritage</link>
    <description>This is Pedestrian Bridge Heritage Assessment undertaken by Curio Projects for Transport for NSW in August 2023. It details the heritage impacts, especially in North Eveleigh for a bridge built from Traverser 1 over which the bridge would need to be built and the visual and physical impact of ramps on the North Eveleigh Heritage. The Assessment deals with the location of TfNSW’s 2025 preferred option 4. Heritage NSW approval will be required as part of any development to build the bridge.</description>
    
    <dc:publisher>No publisher</dc:publisher>
    <dc:creator>REDWatch</dc:creator>
    <dc:rights></dc:rights>
    <dc:date>2026-03-01T05:27:29Z</dc:date>
    <dc:type>File</dc:type>
  </item>


  <item rdf:about="http://www.redwatch.org.au/RWA/statesignificant/northeveleigh/bridge/260301gipacatchment">
    <title>Bridge Catchment Analysis v 5.0 July 2023 (GIPA)</title>
    <link>http://www.redwatch.org.au/RWA/statesignificant/northeveleigh/bridge/260301gipacatchment</link>
    <description>This is the latest version (July 2023) of the Redfern North Eveleigh Paint Shop Precinct Bridge catchment analysis report by SCT Consulting. The GIPA release includes earlier versions of this report from October 2021 (v1) also quoted by ARUP and an April 2023 v3 report included in an undated ARUP report. The earlier reports can be found in the full GIPA release on this website. Some projections change between reports. The original catchment analysis was done in 2021 to assess who would benefit from the bridge. It includes walking times from 5 to 30 minutes from Carriage Workshops and Chanel 7 and then compares savings through a bridge and the Southern Concourse. It also undertakes a bridge demand analysis however the report does not include the information necessary to understand key diagrams or to understand the basis for projections. The final section of the report added in 2023 provides a retail sensitivity analysis for retail added into North Eveleigh. This report uses an earlier bridge location which is 100m closer to Redfern station than the June 2025 preferred location, so care needs to be taken in interpreting this report for the preferred location.</description>
    
    <dc:publisher>No publisher</dc:publisher>
    <dc:creator>REDWatch</dc:creator>
    <dc:rights></dc:rights>
    <dc:date>2026-03-01T05:27:28Z</dc:date>
    <dc:type>File</dc:type>
  </item>





</rdf:RDF>
