You are here: Home / Government Sites Plans & Activities / Elizabeith Street SSDA / 660 Elizabeth St Redfern (PCYC site) Redevelopment - Exhibition until 4 December 2024

660 Elizabeth St Redfern (PCYC site) Redevelopment - Exhibition until 4 December 2024

The documents for the Bridge Housing / Homes NSW redevelopment of the PCYC site opposite Redfern Oval have gone on exhibition today for 28 days until December 4 2024. This is the initial advise REDWatch supplied to its supporters about the exhibition.

The link to the exhibition documents is SSD-51274973 600-660 Elizabeth Street, Redfern - Mixed Use. The main document is Environmental Impact Statement and the other documents are appendices that provide additional information. At the end of this email we will provide a list of the documents in order so they can be easily located as they are jumbled up on the Department of Planning website. Submissions can be made from this link on the exhibition site.

The proposal contains some significant changes from Bridge’s initial presentation to REDWatch on 2 March 2023. Bridge have dropped the 100 proposed private apartments from the scheme  and are now proposing only social and affordable housing on the site in addition to a new PCYC, Bridge’s offices and 11 disability / carer units. The application states that if financing for the affordable housing does not eventuate they will submit a new DA. The current estimated development cost is $213,606,722 (excluding GST).

There is no information we can see that details what kind of affordable housing is proposed. The initial proposal contained both affordable housing linked to income as well as discount off market housing which was only proposed to be affordable for 10 years.

The documents propose an increase of 24 units on the site to bring the total to 355. The 100 private units have been replaced by 77 extra affordable and 47 extra social. Given that Homes NSW only required 100 units on the site it is not clear if the extra 47 will be part of the Homes deal or if Bridge Housing will own and operate some themselves. The initial proposal was that the Homes NSW social housing units would be operated by the Waterloo successful tendering. As the consortium Bridge was part of withdrew from the Waterloo tender, there is the possibility that while Bridge might build these Units they may now be operated by the successful Waterloo tender.

The proposal includes an application (Appendix E) for a slight increase in height over the edge of one building as well as a request for additional floor space allowance (Appendix F). The figures on the latter are not clear due to the need to juggle site FSR’s of 1.5:1, allowance for the community facility 0.57:1), a 10% design excellence allowance and a BASIX water allowance (0.15:1) that the says the site does not meet. The FSR requested is 2.442:1 which the application says is an increase of 6.75% if they had met the BASIX targets.

Obviously REDWatch has not had a chance to go through the documents in detail and we will approach Bridge for clarification and see if we can arrange a community meeting where Bridge can brief the community on their proposal and ask any questions. The short exhibition time means that it falls between our November AGM tonight and the first Thursday in December.

Below is our list of the Documents for SSD-51274973 600-660 Elizabeth Street, Redfern - Mixed Use. in order so they match those in the Environment Impact Statement:

Environmental Impact Statement

View

A_Architectural Drawings_Building S1_

View

A_Architectural Drawings_Building S2_

View

A_Architectural Drawings_Building S3_

View

A_Architectural Drawings_Building S4_

View

A_Architectural Drawings_Full Site_

View

B_Design Report+Verification_Part 1 Oct

View

B_Design Report+Verification_Part 2-3 Oct

View

B_Design Report+Verification_Part 4 Oct

View

B_Design Report+Verification_Part 5 Oct

View

B_Design Report+Verification_Part 6-7 Oct

View

B_Design Report+Verification_Part 8 Oct

View

C1_Landscape Design Report_

View

C1_Landscape Plans_

View

D_Site Survey_

View

E_Clause 4.6 Variation - Building Height Oct

View

F_Clause 4.6 Variation - FSR Oct

View

G_SEARs Compliance Table_

View

H_Statutory Compliance Table_

View

I_Mitigation Measures_

View

J_Design Guide Compliance Assessment Oct

View

K0_Design Excellence Process Summary Report_

View

K1_Design Excellence Strategy_

View

K2_S2 Design Competition Report_

View

K3_S1 Expression of Interest Summary Report_

View

K4_Design Review Panel Terms of Reference_

View

K5_Design Review Panel Advice_

View

L_Connecting with Country Report_Part1_

View

L_Connecting with Country Report_Part2_

View

M1_BDAR Waiver Request_

View

M2_BDAR Waiver_

View

M3_BDAR Waiver Determination_

View

N_Consultation Outcomes Report_

View

O_Social Impact Assessment_

View

P_Visual Impact Assessment Oct

View

Q_Pedestrian Wind Environmental Assessment_

View

R_Transport Assessment_

View

S_Noise and Vibration Impact Assessment_

View

T_Acid Sulfate Soils Management Plan_

View

U_Phase 1 ESA and Geotechnical Desktop Study_Part1_

View

U_Phase 1 ESA and Geotechnical Desktop Study_Part2_

View

U_Phase 1 ESA and Geotechnical Desktop Study_Part3_

View

V_Stage 2 Contamination Assessment_

View

W1_Site Auditors Advice_

View

W2_Remediation Action Plan_Part1_

View

W2_Remediation Action Plan_Part2_

View

W2_Remediation Action Plan_Part3_

View

X_Geotechnical Investigation Report_

View

Y_Arboricultural Impact Assessment Oct

View

Z_Flood Assessment_Part1_

View

Z_Flood Assessment_Part2_

View

AA_Stormwater Report_

View

BB1_PCYC Hazardous Building Materials Survey_December 2019_

View

BB2_PCYC Asbestos Assessment_December 2022_

View

CC1_ACHAR cover letter_

View

CC2_ACHAR_

View

DD_Statement of Heritage Impact_

View

EE1_Historical Archaeological Assessment cover letter_

View

EE2_Historical Archaeological Report_

View

EE3_Post-Archaeological Excavation Report_

View

FF_Waste Management Plan_

View

GG_Operational Waste Management Plan_

View

HH1_Ecologically Sustainable Development

View

HH2_BASIX and NatHERS Report and Plans_

View

II_Crime Prevention Through Environmental Design Report_

View

JJ1_Dewatering Management Plan_

View

JJ2_Groundwater Monitoring Report_

View

KK_BCA Report_

View

LL_Accessibility Report_

View

MM_Infrastructure and Utilities Management Plan_

View

NN_Civil Engineering Plans_

View

OO_Staging Plans_

View

0_EDC Cover Letter Oct

View

Owners consent

View

Industry Specific SEARs Identified Sites and Precincts_161

View

 

More information will be added as more information becomes available.