Built Environment Plan Phase 2 - Public Housing Estates
On 27 January the RWA released the Draft of Phase 2 of their Built Environment Plan (BEP2). Below you will find details of the plan which was only on exhibition until 28 February 2011. REDWatch has collected a range of background materials about the issues associated with the redevelopment of public housing - these can be found via the Public Housing tab at the top of the page or by the link at the foot of this page. The RWA Draft BEP2 is being finalised by the Sydney Metropolitan Development Authority as aprt of a wider precinct study.