NIDC Proposed Operating and Reporting Structure
This is a copy of the ILC's NIDC Proposed Operating and Reporting Structure as at June 2008. The diagram envisages a NIDC Board responsible to the ILC Board responsible for the NIDC Centre management. File is 15Kb PDF.
mngt structure.PDF
—
PDF document,
14 kB (14354 bytes)