Bridge Catchment Analysis v 5.0 July 2023 (GIPA)
This is the latest version (July 2023) of the Redfern North Eveleigh Paint Shop Precinct Bridge catchment analysis report by SCT Consulting. The GIPA release includes earlier versions of this report from October 2021 (v1) also quoted by ARUP and an April 2023 v3 report included in an undated ARUP report. The earlier reports can be found in the full GIPA release on this website. Some projections change between reports. The original catchment analysis was done in 2021 to assess who would benefit from the bridge. It includes walking times from 5 to 30 minutes from Carriage Workshops and Chanel 7 and then compares savings through a bridge and the Southern Concourse. It also undertakes a bridge demand analysis however the report does not include the information necessary to understand key diagrams or to understand the basis for projections. The final section of the report added in 2023 provides a retail sensitivity analysis for retail added into North Eveleigh. This report uses an earlier bridge location which is 100m closer to Redfern station than the June 2025 preferred location, so care needs to be taken in interpreting this report for the preferred location.