Navigation
Log in


Forgot your password?
 

Redfern Station Revised Concept Design Report Section A Architectural Design 2009

This is Part A of the Redfern Station Revised Concept Design report Section A Architectural Design undertaken by Cox. This part of the report deals with 01 Introduction, 02 Scope of Work, 03 Background, 03.1 The existing station and need for redevelopment, 03.2 Integration with other development projects in the area, 03.3 Summary of previous proposals by Jackson Teece, 04 Summary of Peer Review of previous options, 04.1 Architecture and urban design, 04.2 Accessibility, 04.3 Engineering, 04.4 Crowd modelling, 05 Value Engineering of previous option, 06 Principles of Modern Railway Stations, 06.1 Urban Design objectives, 06.2 Architectural objectives, 6.3 Selected case studies – exemplar projects, 07 Decision making framework for Design Options, 08 Proposed Revised Concept Design, 08.1 Overall station vision to 2061, 08.2 Description by component, 08.2.1 Address, 08.2.2 New Paid Concourse, 08.2.3 Platforms, 08.2.4 Unpaid link, 08.2.5 Lawson street concourse, 08.2.6 Heritage, 08.2.7 Commercial development, 08.03 Outline of issues/ design principals by Discipline, 08.3.1 Urban Design, 08.3.2 Architecture, 08.3.3 Heritage, 08.3.4 Access, 08.3.5 Structure, 08.3.6 Services, 08.3.7 Fire and life safety (Fire engineering), 08.3.8 Rail systems engineering, 09 Construction methodology, 09.1 Introduction, 09.2 Staging, 09.3 Surface Construction sequence, 09.4 Illawarra Relief and Void between Platforms 10 + 11, 10 Costplan, 11 Assessment (Performance against Peer Review recommendations (per discipline), 11.1 Architecture and Urban design, 11.2 Crowd modelling, 11.3 Engineering, 12 Next Steps, 12.1 Introduction, 12.2 Design interfaces, 12.3 Design decisions, Appendix - Revised concept design drawings. This is part A of Document 27 of a GIPA release initiated by Lift Redfern (the documents can be obtained directly from Transport for NSW quoting Disclosure Log reference 1314-02). File is 20MB PDF.