Navigation
Log in


Forgot your password?
 

Redfern Station Revised Concept Design Report Section C Cost and Constructability 2009

This is Part C Cost and Constructability of the Redfern Station Revised Concept Design report Section B Engineering Reports undertaken by Bovis Lend Lease. This part of the report is a scan of the Bovis Lend Lease report and deals with Construction Methodology and Program, Station upgrade and development costs and associated Appendices. Financial figures have been blacked out in this report before release by Transport for NSW. This is part C of Document 27 of a GIPA release initiated by Lift Redfern (the documents can be obtained directly from Transport for NSW quoting Disclosure Log reference 1314-02). File is 133MB PDF.