Navigation
Log in


Forgot your password?
 

Redfern Station Upgrade - 2007 Proposed OptionsJackson Teece

In 2007 Jackson Teece produced a Concept Design Study for the Redfern Station Upgrade in 2007. They recommended three Options for the redevelopment: a "Base Case" (Option D) that addressed easy access, fire and other compliance issues on basically the same footprint ($29.5m); a "Base Case Plus" (Option E) that included additional works with Lawson and Gibbon Sts and the ATP ($55.5m) and; a Full Station Redevelopment (Option C) from a centre loading concourse ($143.3m). Here for ease of providing an overview we have extracted a part of the Jackson Teece report which sets out these options and assesses them. These three options formed the basis for a subsequent Cox Arup Bovis Report that was used for the Gateway funding proposal. The document from which this was extracted was one of the documents released under a GIPA request initiated by Lift Redfern of which REDWatch is a member. File is 728 Kb PDF.

Jackson Teece April 2007 Options Extract.pdf — PDF document, 728 kB (746374 bytes)