Navigation
Log in


Forgot your password?
 

Redfern Station Upgrade - 2007 Study of preferred options

In 2007 Jackson Teece produced a Concept Design Study for the Redfern Station Upgrade. Appendix 4 of that report reported and assessed a number of previous proposals to upgrade Redfern Station as well as some additional suggestions from Jackson Teece. Jacson Teece's Option C emerged from this study as the preferred option. It was later refined in a subsequent study Redfern Station Revised Concept Design report by Cox and formed the basis for the preferred redevelopment option put forward in the Gateway funding proposal. Jackson Teece also developed a Base Case (Option D) and Base case Plus Option (Option E) elsewhere in their report which became the other options in the Gateway proposal - these two options are not covered in this attachment but many others are. This document is one of the documents released under a GIPA request initiated by Lift Redfern of which REDWatch is a member. File is 2.1Mb PDF.

Jackson Teece April 2007 Ap 4.pdf — PDF document, 2114 kB (2164934 bytes)