Navigation
Log in


Forgot your password?
 

Redfern Station Upgrade - 2009 Cox Proposed Revised Concept Design Extract

In mid 2009 Cox Arup Bovis produced a Redfern Station Revised Concept Design Report. This is an extract from that report that shows the Cox revision of the Jackson Teece preferred Option C proposal for the redevelopment of Redfern Station. This Cox proposal was the C1 Option on the Gateway funding proposal. This is an extract of the much larger Revised Concept Design Report and has been provided to provide a quick overview of the key elements of the proposal. This document is extracted from one of the documents released under a GIPA request initiated by Lift Redfern of which REDWatch is a member. This file is 3.8 MB PDF.

Cox Proposed Revised Concept Design s8 extract.pdf — PDF document, 3603 kB (3689673 bytes)